What is a solar power purchase agreement (PPA)?
A solar power purchase agreement (solar PPA) is a long‑term contract where a third party funds, owns and operates a solar PV system on your site, and your business buys the electricity it generates at an agreed per‑kWh rate. This mirrors how corporate PPAs are described in Ofgem’s guidance.
You don’t buy the panels; you buy the power. That’s different from:
- Buying outright: you pay for the system and own the asset.
- A simple roof lease: you rent roof space and may just receive rent.
Core features of a solar PPA agreement:
- Per‑kWh pricing.
- Minimal or no upfront capital.
- Long‑term contract.
- PPA provider responsible for design, performance, operations and maintenance.
This guide focuses on on‑site PPAs for UK businesses and organisations.
On-site solar PPA vs roof lease vs buying outright
An on‑site PPA puts a solar system on your roof or land, with power mainly used on site. The provider owns the system; you pay them a unit rate (p/kWh) for solar electricity, while still paying your normal supplier for any extra grid import under your business tariff (Ofgem explanation of business energy contracts).
A roof lease solar model is different. You lease roof space to a developer, who may export most of the power to the grid under schemes such as the Smart Export Guarantee (Ofgem SEG guidance). You might receive roof rent, a share of export income, or discounted power, depending on the agreement.
Buying outright (capex or financed) means you fund the system, own the panels and all the electricity, and take responsibility for performance, insurance and operations and maintenance (Energy Saving Trust guidance on owning solar PV).
From a buyer’s perspective:
- On‑site PPA: low upfront cost, long commitment, less control over the asset.
- Roof lease: very low involvement, but limited direct energy benefit.
- Buying outright: highest control and complexity, highest upfront spend.
Later sections cover PPA pricing, eligibility and contract risks in more detail.
How an on-site solar PPA works for a UK business
In an on‑site PPA there are three main parties:
- Your business (the offtaker).
- The PPA provider (developer/asset owner, often working with an installer).
- Your existing electricity supplier and the grid.
A typical lifecycle looks like this:
-
Initial enquiry and data sharing
You share recent energy bills, half‑hourly data if available, and site details (roof drawings, photos, tenancy/ownership). Half‑hourly data is standard for larger non‑domestic sites under Ofgem’s settlement rules. -
Site survey and proposal
The provider assesses roof condition, structure, shading and grid connection, then proposes a system size, expected generation and PPA unit rate. Grid connection follows your DNO’s application process, as outlined in ENA’s G99 guidance. -
Contract negotiation and credit checks
Both sides agree term length, pricing structure, access rights and end‑of‑term options. The provider runs credit checks to assess counterparty risk, in line with standard non‑domestic energy contracting practice described by Ofgem. -
Installation and commissioning
The provider funds installation, arranges DNO approvals and commissioning, and sets up metering. Export metering must comply with Ofgem’s metering requirements. Your operations may need to accommodate short access windows. -
Ongoing operation
Solar power feeds into your building and is typically used on site first; any surplus is exported to the grid, with export payments often made under the Smart Export Guarantee (SEG licence conditions). You receive:
- A PPA invoice for solar electricity (per kWh generated or consumed, depending on the deal).
- A normal bill from your supplier for remaining grid import and standing charges.
For example, a warehouse with large daytime demand might cover a significant share of its usage from an on‑site PPA, while still relying on its supplier overnight and in winter.
Typical UK PPA rates, terms and contract structures
Solar PPA agreements in the UK are built around a few common commercial levers, which sit alongside standard UK metering and billing rules for electricity supply and export.Ofgem guidance on electricity supply licences
Pricing structures
Most PPA for solar offers use one of these:
- Fixed unit rate: a single p/kWh price for the whole term. This mirrors how many fixed‑price business tariffs work, where you pay a set unit rate for each kWh used over a defined period.Ofgem guide to business energy tariffs
- Fixed rate with scheduled increases: a starting price with pre‑agreed annual uplifts, often linked to expected changes in operating costs or inflation measures such as the Consumer Prices Index.ONS overview of consumer price inflation
- Indexed rate: the PPA price tracks an index (for example, CPI) or a benchmark wholesale/retail price formula, usually with a floor and/or discount. The index and calculation method should be clearly defined in the contract so you can model future costs.
Term length and responsibilities
PPAs are multi‑year agreements. Longer terms often support lower per‑kWh pricing because the provider recovers their investment over more years, similar to how regulated network charges are spread over asset lives in price controls.Ofgem RIIO price control overview
Typically:
- The PPA provider owns the system throughout the term, in line with common third‑party ownership models described in commercial solar guidance.Energy Saving Trust – solar panels for businesses
- The provider insures, operates and maintains it, including inverter replacements and performance monitoring.
- You grant access for installation, inspections and repairs, usually subject to notice and health and safety rules under UK workplace regulations.HSE guidance on workplace health and safety
Metering is usually via a dedicated generation meter or sub‑meter that complies with UK metering standards.Ofgem guidance on metering You’ll receive:
- A PPA invoice based on metered generation or consumption, as defined in the contract.
- A separate bill from your electricity supplier, who remains responsible for your grid import and standing charges under supply licence rules.Ofgem – supply licence obligations
Key clauses to expect
Common clauses in a UK PPA solar agreement include:
- Price, indexation and any caps/floors.
- Performance or availability standards and remedies.
- Access rights and coordination with roof or site works.
- Change in law and how extra costs are handled.
- Termination rights and fees.
- End‑of‑term options (extension, removal, or purchase at a defined valuation method).
Because these are long‑term commitments, businesses should take independent legal and accounting advice before signing.
If you’re also considering buying a system, it can help to compare PPA offers with the capex route using a simple payback or NPV view; our guide to commercial solar panel cost in the UK explains how those economics are usually assessed.
Who qualifies for a solar PPA? Roof, credit and electricity use
PPA providers focus on sites where a system can operate reliably for many years and where the business is likely to use most of the power generated on site, which aligns with how commercial solar is typically deployed in the UK according to the Energy Saving Trust.
Site and roof factors
Typical checks include:
- Roof type and condition: a sound roof with enough remaining life to match the PPA term. Guidance on solar and roof condition from the Energy Saving Trust notes that older roofs may need works before installation.
- Available area and shading: enough unshaded space for a viable system size, as shading can significantly reduce output per MCS installation guidance.
- Structural suitability: ability to support panel and ballast loads; sometimes confirmed by a structural survey, in line with HSE guidance on roof work and loading.
- Permissions: planning checks where relevant (see planning permission for solar panels on commercial buildings) and any required landlord consent, reflecting the need for appropriate consents in Planning Practice Guidance on renewables.
Ground‑mount and solar carports for UK businesses can also be funded via PPAs, subject to similar assessments.
Electricity use and credit
Providers usually look for:
- Daytime electricity use that broadly aligns with solar generation, which is when PV output is highest per Energy Saving Trust’s solar PV overview.
- Reasonably stable or predictable demand over time.
They also run credit checks to assess your ability to pay over the term, reflecting standard counterparty‑risk practice in long‑term energy contracts highlighted by Ofgem’s guidance on power purchase agreements. Longer contracts or larger systems may require stronger credit profiles or parent guarantees.
Owner‑occupiers vs tenants
Owner‑occupiers are often simpler, as they control the roof and operations. For tenants, providers will look at:
- Remaining lease length vs PPA term, consistent with the need for security of tenure in long‑term arrangements discussed in government guidance on business leases.
- Landlord approvals and any service‑charge implications.
How PowerPilot fits in
PowerPilot collects basic information upfront – recent bills, site details, roof type and occupancy – and uses it to match you only with PPA installers and developers likely to be interested in your project. Those providers then confirm technical and credit suitability during their own assessment.
Risks of solar PPAs and what to check in the contract
Solar PPAs can work well, but they’re long‑term commitments. Understanding the main risks helps you negotiate better terms.
Commercial risks
- Long‑term commitment: you’re agreeing to buy power for many years. If your site closes, downsizes or automates, you may use less electricity than expected, while still being contracted to take (or pay for) a defined volume.
- Volume risk: some contracts assume a certain consumption profile; check what happens if your usage falls or shifts outside normal business hours.
- Price risk: a fixed or indexed PPA rate may end up above or below future grid tariffs published under your business supply contract, which typically include standing charges and unit rates set by your supplier and regulated by Ofgem.
Technical and operational risks
- Underperformance and downtime: output may be lower than forecast due to weather, faults or degradation. Guidance on typical performance and degradation is set out in product datasheets and in resources such as the Energy Saving Trust’s solar PV overview. Check how performance is defined, monitored and reported, and what remedies apply.
- Access and disruption: the provider will need access for maintenance and inspections. Poorly drafted clauses can clash with your operations or health and safety rules under the Health and Safety at Work etc. Act 1974.
Counterparty risk
You rely on the PPA provider to operate and maintain the system for the full term. If they fail, you need clarity on who steps in, what happens to the asset, and how your supply and roof are affected, alongside your ongoing rights as an electricity customer under Ofgem’s business consumer guidance.
Contract points to review and question
Before signing, work through points such as:
- How performance/availability is measured and what happens if targets aren’t met.
- What happens if the roof needs replacement, strengthening or other major works.
- Who controls export and any revenue from surplus power (for example, Smart Export Guarantee payments; see Smart Export Guarantee rates compared).
- What happens if you sell the building, change tenant, or restructure your organisation – can the PPA be assigned or novated, and on what conditions?
- How termination fees or buyout amounts are calculated at different points in the term.
- Responsibilities for decommissioning and making good at the end of the contract.
Bring in legal, finance and estates/facilities teams, and compare multiple offers side by side before committing.
How PowerPilot helps you get and compare solar PPA quotes
PowerPilot is not an installer or PPA provider. It’s a matching service that introduces UK businesses to vetted commercial solar installers and developers, including those offering solar PPA agreements.
Before adding companies to its network, PowerPilot checks for:
- Relevant commercial solar and PPA experience.
- Appropriate certifications or trade memberships (for example, MCS where applicable, and recognised health and safety schemes such as those listed by the Safety Schemes in Procurement forum).
- A track record of delivering and operating systems for UK businesses.
A typical process looks like this:
- You share basic site and usage information via PowerPilot – recent bills, roof or land details, and whether you’re interested in PPA, capex or both.
- PowerPilot matches you with up to three suitable installers or PPA providers.
- Those providers contact you directly to arrange surveys, discuss options and issue proposals and contracts.
When comparing PPA quotes, look beyond the headline unit rate:
- Pricing structure and indexation (for example, whether it tracks an inflation index such as CPI).
- Contract length and end‑of‑term options.
- Performance guarantees, maintenance responsibilities and response times.
- Approach to roof works, access, health and safety and coordination with your operations.
- How export is handled and who receives any revenue, including any Smart Export Guarantee income.
If you also want to compare PPAs with buying a system outright, PowerPilot can introduce you to installers who quote for both models, so you can weigh long‑term costs and control side by side. You can start that process via commercial solar for UK businesses.
Frequently asked questions
What is the difference between a solar PPA, a roof lease and buying outright?
In a solar PPA, a third party funds and owns the system and you buy the electricity it generates under a long‑term contract, similar in principle to other private‑wire PPAs described by Ofgem. In a roof lease, you mainly rent roof space and may receive rent or limited power benefits. Buying outright means you fund and own the system and take on performance, insurance and maintenance.
Who owns the panels in a solar PPA?
In most UK solar PPA agreements, the PPA provider owns the panels and associated equipment for the full contract term, in line with how generators typically retain ownership under private‑wire arrangements described by Ofgem. They’re responsible for design, insurance, operations and maintenance, and retain access rights. End‑of‑term options usually include extension, removal or a transfer of ownership at an agreed valuation.
What happens at the end of a solar PPA term or if I sell the building?
End‑of‑term options are set out in the contract and often include extending the PPA, buying the system at an agreed valuation method, or having it removed and the roof made good. If you sell the building or change tenant, PPAs usually allow assignment or novation to the new occupier or owner, subject to conditions and their creditworthiness.
What are the main risks in a solar PPA contract and how can a buyer manage them?
Key risks include long‑term purchase commitments, changes in your electricity use, future grid price movements, system underperformance, and reliance on the provider’s financial and technical strength, all of which affect your overall energy position as described in Ofgem’s business energy guide. You can manage them by scrutinising performance and termination clauses, clarifying roof‑works and export arrangements, involving legal and finance teams, and comparing multiple offers through services like Compare commercial solar installers in the UK.
How can PowerPilot help me explore a PPA alongside other options?
PowerPilot collects basic information about your site, electricity use and preferences, then introduces you to up to three vetted installers or developers. They can quote for a solar PPA, buying outright, or both, so you can compare unit rates, contract terms and responsibilities side by side and decide which approach suits your organisation.
Sources
The 13 sources behind this page
- Ofgem explanation of business energy contracts (ofgem.gov.uk)
- Ofgem SEG guidance (ofgem.gov.uk)
- Energy Saving Trust guidance on owning solar PV (energysavingtrust.org.uk)
- G99 guidance (energynetworks.org)
- Ofgem guidance on electricity supply licences (ofgem.gov.uk)
- ONS overview of consumer price inflation (ons.gov.uk)
- Ofgem RIIO price control overview (ofgem.gov.uk)
- HSE guidance on workplace health and safety (hse.gov.uk)
- per MCS installation guidance (mcscertified.com)
- Planning Practice Guidance on renewables (gov.uk)
- Health and Safety at Work etc. Act 1974 (legislation.gov.uk)
- Safety Schemes in Procurement forum (ssip.org.uk)
- CPI (ons.gov.uk)